2016 Roof Renovation Completed

This year we worked on the roof at the front of the house, the last chimney was also removed.
img_ds_beforeThe old dormers (dach gaube) at the front were removed and replaced with Velux windows, extra windows were installed in the top loft room to let more light in.

img_ds_finish

We learned a lot from working on the roof at the back of the house, so the finish on the front of the house is much better.

img_s_25

Even Debbie got out on the roof to help with the installation.

img_s_50

Installed a new 2€ coin from 2016 with the Sachsen/Dresden image near the top left of the roof. Something for a future builder to find.

This entry was posted in Website. Bookmark the permalink.